Aloha Folks
Here is the report going to NSF.
Science IPT Objectives:
• Deliver the final long-baseline configuration in December 2005: A
strawman long-baseline configuration design was delivered in July 2005.
This design awaits reconciliation with the design for the road and
fiber network on the site. The Statement of Work and specifications for
the latter have been submitted by the Site IPT.
• Deliver all remaining baseline configurations in September 2006: On
schedule.
I believe this to be where we are.