[evlatests] Weather Station
Kevin Ryan
kryan at nrao.edu
Tue Jan 10 15:59:28 EST 2012
The CMP would've been restarted after power was restored on 12/23.
Needing a Modcomp attached is news to me. I ran the CMP alone on the spare SLC for months during development both on a bench down in the basement of the AOC and at the site controlling the system and I don't recall this need.
Kevin
On Jan 10, 2012, at 1:20 PM, Ken Sowinski wrote:
> On Tue, 10 Jan 2012, Steven Durand wrote:
>
>> -------- Original Message --------
>> Subject: Weather Station
>> Date: Tue, 10 Jan 2012 10:02:47 -0700
>> From: Wayne Koski <wkoski at aoc.nrao.edu>
>> Organization: NRAO
>> To: evlatests at nrao.edu
>>
>> My conclusion is that the issue is either at the CMP or between the SLC
>> and CMP.
>>
>> At this point, I don't know what to look for in order to move forward.
>>
>> Finally, I have a very vague recollection that we needed for the
>> alternate Computer Port of the SLC to be plugged into the Modcomp (even
>> powered down) for proper signal termination for the CMP to start
>> operations or to maintain operations. Remember this is vague and I
>> could have it wrong, but if this was stripped out then maybe this is it.
>
> Yes, this was certainly the case once. I don't remember that
> we ever understood why it was necessary. What worrys me about
> this explanation is that the CMP/SLC worked for a long time after
> the Modcomps were disconnected from the SLC and carted away.
>
> Was the CMP restarted during your efforts at the VLA yesterday?
>
> _______________________________________________
> evlatests mailing list
> evlatests at listmgr.cv.nrao.edu
> http://listmgr.cv.nrao.edu/mailman/listinfo/evlatests
More information about the evlatests
mailing list