[evlatests] Antenna 6 and 26
Rudy Latasa
rlatasa at nrao.edu
Wed Jun 8 15:01:21 EDT 2011
Antenna 6 and 26 are are back in cool down mode and should be cold by
early 6/09/2011. I expect we will continue to see temperature cycling of
the cryogenic temperatures. The two 1050 refrigerators pulled have been
shipped to the manufacture (Austin Scientific) for evaluation and
repairs. Austin will report back to NRAO cryogenics of their findings
and required repairs. Rudy
More information about the evlatests
mailing list