[evlatests] [widar-wg] master LO rewiring complete
Brent Carlson
brent.carlson at nrc-cnrc.gc.ca
Thu Jun 10 15:01:05 EDT 2010
Ken,
I'm currently working on compiling and testing new XBB, RXP, and Recirc
binaries.
I've implemented Dave's idea of no-CRC error switching in both the XBB
and RXP, and if the RXP meets timing, it will mean that the rate of
configuration changes will not be practically limited. I've also done
more testing and have added more forgiveness in my receivers so that
they can tolerate more errors before re-sync.
Not sure when these can be released...RXPs are still compiling.
Brent
Ken Sowinski wrote:
>The redundant master LO eqquipment installation was completed
>yesterday. There were problems sorting out timecode to the
>correlator, but eventually the correlator as well as all antennas
>were working. Delays all had to be reset; that was accomplished
>before observing began last night.
>
>The system is back to normal again. When do we want to test
>all the new switching options?
>
>________________________________________________________________________________
>There is a web page, used as a document repository, associated with this list.
>The URL for the web page is:
>http://listmgr.cv.nrao.edu/pipermail/widar-wg/
>
>
--
Brent R. Carlson
Brent.Carlson at nrc-cnrc.gc.ca
***NEW***
Tel: 250-497-2346 | Fax: (250) 497-2355
*********
Design Engineer | Ingenieur Concepteur
National Research Council Canada | Conseil national de recherches Canada
Dominion Radio Astrophysical Obs. | Observatoire federal de radioastrophysique
P.O. Box 248, 717 White Lake Rd | C.P. 248, 717 Rue White Lake
Penticton, BC, Canada V2A 6K3 | Penticton, (C.-B.), Canada V2A 6K3
Government of Canada | Gouvernement du Canada
"It is ironic that the scientific illiteracy of a scientifically
advanced species could lead to its extinction."
More information about the evlatests
mailing list