[evlatests] Delays need to be reset for some IFs
Kerry Shores
kshores at nrao.edu
Thu Oct 25 14:01:49 EDT 2007
I just had one of the Fiber Techs add/remove a small piece of cable
on the 128 MHz clock lines for some modules. Delays need to be reset
for the following modules, I give the times the modules were modified.
Ant. 18B ~10:45AM
Ant. 24C ~11:00AM
Ant. 19B ~11:30AM
Ant. 16C ~11:57AM
--
Kerry Shores
Electrical Engineer
National Radio Astronomy Observatory
1003 Lopezville Rd.
Socorro, NM 87801
phn: 505-835-7158
fax: 505-835-7027
More information about the evlatests
mailing list