[evla-sw-discuss] correlator state
Kevin Ryan
kryan at nrao.edu
Wed Aug 21 14:43:34 EDT 2013
The testing went well; CPCC's did their thing properly. K.Scott and Jeff got the servers up an running and now Kerry is bringing the correlator up.
The supervisory alarm is still an issue - it did not get fixed this time around; they will try replacing the circuit board (but don't know when). So, we'll have to continue to put up with the red lettering on the GUI.
cpcc1 needed manual rebooting (it did not come up on its own) and I know why. After the shunt trip test, Bob B. restored DC power before the AC. cpcc1 (running off the power plant battery) tried to boot before the network switches were up. I don't think this is an issue because we already know that it will take manual intervention when bringing things up from cold.
Kevin
On Aug 21, 2013, at 12:07 PM, K. Scott Rowe wrote:
>
> We have finished bringing evla lustre and the cbe cluster up. I think
> Kerry is working on the correlator boards now, so it will still be a
> while until everything is back up. As always let the helpdesk know if
> anything seems wrong.
>
>
> _______________________________________________
> evla-sw-discuss mailing list
> evla-sw-discuss at listmgr.cv.nrao.edu
> http://listmgr.cv.nrao.edu/mailman/listinfo/evla-sw-discuss
More information about the evla-sw-discuss
mailing list