[evla-sw-discuss] Filehost replacement date proposal (January 1st noon - 4pm)
James Robnett
jrobnett at nrao.edu
Mon Nov 29 15:59:44 EST 2010
After a bit of debate we're now leaning toward doing the
filehost replacement Saturday January 1st assuming all the
various parties are amenable.
During a filehost replacement every Linux box needs to be
down or at least rebooted at very specific times (plural) to
get around stale NFS filehandle issues and general lack of
infrastructure servers. That includes all linux systems at
the EVLA and VLBA ops machines (but not VLBA site machines).
The scheduling has been heavily influenced by a desire to
avoid affecting normal work hours and EVLA observing. Since
we're not observing part of the 1st anyway the 1st seems to fit
the bill.
What we'd propose is scheduling it for something like noon
to 4pm. The late start is designed to give folks a chance
to recover from a potentially late night and more importantly
coincide with the operator availability at 4pm.
I suspect we'll be done sometime before 3pm and spend the
next hour or so checking systems at which point we can hand
things over to Ops for checking at 4pm.
Right now everything's tentative but I wanted to bounce this
off folks that might need to do be involved to ensure proper
restart of Widar and M&C systems as well as VLBA ops.
The alternative suggestions have been the evening of the
29th (front end of double maintenance day) or during the day
some other time.
Personally the 1st seems like the best option.
james
More information about the evla-sw-discuss
mailing list