[daip] [!10702]: AIPS - Phase wraps 3C84
Jared Rice
nraohelp at nrao.edu
Thu Jul 20 14:03:58 EDT 2017
Phase wraps 3C84
----------------
Ticket ID: 10702
URL: https://help.nrao.edu/staff/index.php?/Tickets/Ticket/View/10702
Full Name: Jared Rice
Email: jrice at physics.unlv.edu
Creator: User
Department: AIPS Data Reduction
Staff (Owner): Amy Mioduszewski
Type: Issue
Status: Open
Priority: Default
SLA: NRAO E2E
Template Group: Default
Created: 19 July 2017 10:09 PM
Updated: 20 July 2017 06:03 PM
Due: 24 July 2017 06:03 PM (4d 0h 0m)
Resolution Due: 28 July 2017 06:03 PM (8d 0h 0m)
Dear Amy,
The IFs are contiguous so there is no issue there. We removed the CL and
SN tables created by VLBAPCOR and then we ran VLBAMPCL. There were 16
good solutions, 144 failures for 3C84. Maybe there is still an issue
with 31DEC15 version? Would it be possible to run the 6cm data through
the pipeline over there?
Regards,
Jared
On 7/20/17 8:00 AM, NRAO Helpdesk wrote:
> Dear Jared,
>
> Those phases do look terrible. Phase wraps after VLBAPCOR aren't necessarily "bad" but this correction should remove any phase jumps between the IFs. Is the frequency continuous between the IFs? There probably nothing wrong with the version of AIPS you are running, I suspect there is something wrong with the values in the PC table. The simple solution is to run VLBAMPCL which does a manual phase cal (using FRING) and that should fix things nicely. Remember to remove the CL and SN tables made by VLBAPCOR with EXTD.
>
>
>
> Amy Mioduszewski
> VLA Scheduling Manager
> NRAO
>
>
> Ticket Details
> ---------------------------------
> Ticket ID: 10702
> Department: AIPS Data Reduction
>
> Support Center:https://help.nrao.edu/index.php?/Tickets/Ticket/View/10702
------------------------------------------------------
Staff CP: https://help.nrao.edu/staff
More information about the Daip
mailing list