BIWEEKLY CALENDAR OF THE ALMA PROJECT at NRAO
December 20, 2004 -- January 3, 2005
******************************** THIS FORTNIGHT*********************************
Merry Christmas and Happy New Year!
---------------------------------------------------------------------------
>From Dr. Lo: On December 8 President Bush signed the Omnibus
Appropriations Act of FY 2005, containing funding for a variety of
agencies including the National Science Foundation (NSF). FY 2005
funding for NSF is lower than requested, with funding in Mathematical
and Physical Sciences reduced by 1.6% from the FY2004 level (see the
report at http://www.aaas.org/spp/rd/nsf05c.htm). ALMA construction is
funded at the expected $49.67M level.
---------------------------------------------------------------------------
Adrian Russell is the father to a new baby girl--congratulations, Adrian!
---------------------------------------------------------------------------
Phone numbers of JAO personnel at 40 El Golf are wrong in the new
NRAO phone book; please note the correct numbers:
Beasley: +56-2-467-6140
---------------------------------------------------------------------------
Stacy Oliver will be leaving ALMA at the end of the year. Thanks for
all the work you have done to build almaedm, Stacy, and best wishes!
As of 3 January, the EDM document specialist role with be covered by our
European colleagues, with Nathalie and Elena taking over the administration
of the system as they can best fit it in among other tasks. Eventually,
EDM responsibilities will migrate to Chile.
---------------------------------------------------------------------------
Congratulations to Kevin Long, who will migrate to Chile in early February
to work with the EDM and PMCS systems.
---------------------------------------------------------------------------
Past issues of this Calendar may be viewed at
http://www.cv.nrao.edu/~awootten/mmaimcal/ALMACalendars.html
*******************************************************************************
General Happenings
SPdA: Road work continues between km 26 and 28. The 7km of road
from Chilean Highway 23 to the Operations Support Facility (OSF)
is now complete. 40 workers and 8 pieces of heavy equipment toil
on the site.
Tucson: Group is supporting reactivation of the ATF holography receiver.
ATF: A final review was held of the AEC antenna, which was accepted by
ALMA on Friday 17 December. The holography system is being reinstalled
for further antenna tests. Mangum is at the ATF for antenna evaluation.
AOC: Digitizer/demux (PHOBOS 2) acceptance production tests have been
successfully completed at Bordeaux. Cable wrap design being studied.
Computing all-hands meeting in Europe was successful.
NTC: Reactivation of the holography receiver and transmitter are
being supported.
Window reflections in the B6 cartridge are being addressed.
(HIA): B3 noise tests on Cartridge No. 1 about to begin.
LO: x3 stage of multiplier reaches all but top end of 650 GHz band.
Delay model firmware installed to support interferometry on 2-element
correlator at the ATF, First prototype tunable filter bank card delivered
to Bordeaux.
NAASC: Monthly meeting notes at https://wiki.nrao.edu/bin/view/ALMA/NAASC
(Internal only).
DAILY CALENDAR (Times EST )
Mon 20 Dec
10:30 AM-12:00 PM: JAO/IPT Teleconference
Tue 21
10:00 AM-12:00 PM: Change Control Board Telecon
Wed 22
Thu 23 All day event: NRAO Holiday
Fri 24 All day event: NRAO Holiday
Sat 25 MERRY CHRISTMAS!
Sun 26
Mon 27
Tue 28
Wed 29
Thu 30
Fri 31 All day event: NRAO Holiday
Sat 01 January 2005 HAPPY NEW YEAR!
Sun 02
****************************** UPCOMING EVENTS ******************************
ALMA Calendar
* 5-7 Jan 2005 -- UNSC URSI Boulder meeting Commission J
* 6 Jan 2005 -- ANASAC Telecon
* 11 Jan 2005 - ALMA Town Meeting, AAS San Diego, 1pm Royal Palm 1-3
* 13-15 Jan 2005 -- CSV Meeting, Socorro
* 27 Jan 2005 -- ALMA Board Telecon
* 24-25 Feb 2005 -- ASAC face-to-face meeting, Garching (tent)
******************************* TECHNICAL NEWS *******************************
*******************************ALSO OF INTEREST*******************************
******************************************************************************
Please send information for upcoming calendars by Friday evening of the
preceding biweekly period to Jennifer Neighbours or Al Wootten via e-mail
(jneighbo at nrao.edu or awootten at nrao.edu).
The calendar will be issued between late Friday and sometime on Monday by e-mail
to all NRAO scientific staff members and anyone else interested. A specific
mailing list, alma-info, has been created for anyone wishing to receive it.
Past issues are available at
http://www.cv.nrao.edu/~awootten/mmaimcal/ALMACalendars.html
More information about the mmaimcal
mailing list