[mmaimcal]Comments? ALMA Configuration CDR plans
Al Wootten
awootten at NRAO.EDU
Tue Dec 18 13:38:09 EST 2001
To Configuration Group and Interested Parties
Details of the Configuration CDR
Date: January 24-25, 2002
Location: Array Operations Center, NRAO, Socorro, N. M.
Access:
Fly into Albuquerque. Details on making your way from the Albuquerque
airport to Socorro will be forthcoming. It is about 70 miles, one hour.
Lodging:
The CDR occurs just after the EVLA LO/IF PDR to be held 22-23 Jan, and
before the NSF review of AUI, to be held the following week. We will
lodge visitors in the Visiting Scientist Quarters and local hotels.
Please let me know your plans for arrival and departure dates as soon as
possible. Note that if you plan a Saturday night stayover, the ski areas
at Santa Fe (quite a charming town) are about an hour north of the airport
in Albuquerque. If enough are interested in visiting the VLA, about an
hour west of Socorro, that may be arranged also. You will not see much of
the ALMA prototype antenna at this early date.
2) Attendant List (PLEASE COMPLETE)
Bryan Butler bbutler at nrao.edu
Leonia Kogan lkogan at nrao.edu
Steve Myers smyers at nrao.edu
Crystal Brogan cbrogan at nrao.edu
Craig Walker cwalker at nrao.edu
John Conway John Conway <jconway at oso.chalmers.se>
Frederic Gueth Frederic Gueth <gueth at iram.fr>
Stephane Guilloteau "Stephane Guilloteau" <guillote at iram.fr>
Steven Heddle "Steven Heddle" <steven at kw15.co.uk>
Mark Holdaway mholdawa at nrao.edu
Jeff Kingsley, Antenna Division Head jkingsle at nrao.edu
Jerome Pety Jerome Pety <pety at iraux2.iram.fr>
Jeff Mangum, jmangum at nrao.edu
Koh-Ichiro Morita "Morita, Koh-Ichiro" <morita at nro.nao.ac.jp>
Simon Radford, Site Division Head sradford at nrao.edu
Gie Han Tan, System engineering Gie Han Tan <ghtan at eso.org>
Francois Viallefond
Frederic Boone <frederic_boone at yahoo.fr>
Adrian Webster
Al Wootten
David Woody
"Seiichi Sakamoto" <seiichi at nro.nao.ac.jp>
Eric Anterrieu (Eric.Anterrieu at cerfacs.fr)
Dick Kurz <rkurz at eso.org>,
"Jacob Baars" <jbaars at eso.org>,
"Robert Brown" <rbrown at NRAO.EDU>,
"Marc Rafal" <mrafal at NRAO.EDU>,
+ ASAC members to be confirmed
Invited members / reviewers
Lee Mundy
Mel Wright
David Woody
3) Documents
To be ready 2 weeks in advance for distribution, or 9 January
- Spiral concept (Conway)
- uv-metric concept (Boone)
- Hybrid concept (Webster)
- Imaging tests (Guilloteau, Heddle, others?)
4) Goal of the meeting: select a baseline design to continue with detailed
implementation work ...
CDR Review Guidelines Version 2 - 98November09 P. J. Napier
The purpose of the CDR of an MMA Subsystem is principally to review 3
questions:
(1) Are the detailed requirements for the subsystem complete and adequate?
(2) Will the design selected for implementation on the test array meet the
requirements?
(3) Are interfaces to other subsystems defined adequately and completely?
(4) Has adequate attention been given to the produceability and maintainability
of the subsystem?
Meeting organization and attendance to be the same as a PDR. MMA199901-0010
Actually, there are four, and we aren't MMA anymore but the rules have not
changed...
Agenda of PDR:
http://www.cv.nrao.edu/~awootten/mmaimcal/almaconfigpdragenda.html
Report of PDR:
http://www.alma.nrao.edu/administration/designreviews/configurationpdr.html
---------------------------------------------------------------------------
Could you please (1) confirm your participation as soon as possible, and
(2) give me the following information before January 4 :
Date of arrival :
Date of Departure :
Need for a single or double-room ?
More information about the mmaimcal
mailing list