[evlatests] ea16 status
Gene Cole
ecole at nrao.edu
Wed Jul 16 11:15:14 EDT 2014
We once had an issue with the feed window clamp on ea17 where water kept getting into the X-feed. This was remedied by replacing the four piece clamp with a two piece clamp. I had presumed we were changing out all the other 4 piece clamps. I'll investigate where we are and report back.
As for dry air systems only 13 and 26 remain to be outfitted.
--Gene
-----Original Message-----
From: evlatests-bounces at nrao.edu [mailto:evlatests-bounces at nrao.edu] On Behalf Of rperley at nrao.edu
Sent: Wednesday, July 16, 2014 8:54 AM
To: Bryan Butler
Cc: evlatests at nrao.edu
Subject: Re: [evlatests] ea16 status
Are any of the wet X-bands outfitted with the dry air system?
Any reason why only X-band is suffering this problem now?
Rick
> thanks, wes.
>
>
> Wes Grammer wrote, On 7/16/14 8:27 :
>> Bryan, we had planned to have a look at them yesterday, but ended up
>> spending almost the whole day at 16. We have a large crew going out
>> today, and will check out 5 & 10. I'm pretty sure there's probably
>> still water in the feed.
>>
>> -Wes
>>
>> On 7/15/2014 3:54 PM, Bryan Butler wrote:
>>>
>>> did you have a chance to look at 5 & 10? it may be that it rained
>>> after they were drained yesterday, because they both are not working
>>> at X-band.
>>>
>>> -bryan
>>>
>>>
>>> Wes Grammer wrote, On 7/15/14 14:43 :
>>>> A quick, real-time update on ea16 receiver status:
>>>>
>>>> 1. L-band output cables have been swapped, to correct the
>>>> polarization problem.
>>>>
>>>> 2. We've been unable to cool the S-band RX since ea16 went online
>>>> last week. Cryo is here right now, checking the vacuum distribution
>>>> system for leaks - there wasn't an obvious problem with the receiver itself.
>>>>
>>>> 3. The X-band feed did have a substantial amount of water inside.
>>>> We dropped the receiver and radome cover to drain and dry it out.
>>>> Before we leave, we'll reseal it and verify the dry air system is
>>>> working.
>>>>
>>>> At this point, all 7 other cryogenic receivers are cold and appear
>>>> to be functioning normally.
>>>>
>>>> -Wes
>>>>
>>>>
>>>> On 7/15/2014 11:15 AM, Ken Sowinski wrote:
>>>>> On Mon, 14 Jul 2014, Ken Sowinski wrote:
>>>>>
>>>>>> a16 is on the master pad and is beginning to work.
>>>>>>
>>>>>> Current problems:
>>>>>> 1. L band ploarizatios are swapped 2. S band fringes are weak;
>>>>>> perhaps the rx is warm.
>>>>>> 3. No fringes at X band; more water?
>>>>>>
>>>>>> A pointing run is needed. That can be doen at C band tongiht if
>>>>>> the antenna is still working at the end of the day.
>>>>> Tilt for ea16 was determined from the pointing run of last night,
>>>>> so the antenna may be moved whenever desired.
>>>>>
>>>>> I have not yet verified that any of the problems listed above have
>>>>> been remedied.
>>>>>
>>>>> _______________________________________________
>>>>> evlatests mailing list
>>>>> evlatests at listmgr.cv.nrao.edu
>>>>> http://listmgr.cv.nrao.edu/mailman/listinfo/evlatests
>>>>>
>>>>
>>>> _______________________________________________
>>>> evlatests mailing list
>>>> evlatests at listmgr.cv.nrao.edu
>>>> http://listmgr.cv.nrao.edu/mailman/listinfo/evlatests
>>>>
>>>>
>>>
> _______________________________________________
> evlatests mailing list
> evlatests at listmgr.cv.nrao.edu
> http://listmgr.cv.nrao.edu/mailman/listinfo/evlatests
>
_______________________________________________
evlatests mailing list
evlatests at listmgr.cv.nrao.edu
http://listmgr.cv.nrao.edu/mailman/listinfo/evlatests
More information about the evlatests
mailing list