Today we conducted a test of the Master LO system in which we switched
from the Hydrogen maser (primary) frequency standard to the Rubidium
(secondary) standard. We wanted to determine whether (a) timing to the
correlator would be disrupted, and (b) antennas would lose
synchronization with the Master LO rack.
Around 9am, we switched from Maser to Rubidium, resynchronized the 1PPS
timing signal to the GPS receiver, and iterated this switching cycle
twice. In each case, all indications were that the array and the
correlator remained synchronized. Neither the L350s nor the L305s ever
required resynchronization; the green lights on the Timing Chips
(Station Boards and Crossbar Boards) in the correlator remained green;
correlated phase was constant and continuous through the transitions.
We left the array on the Rubidium standard, with the Maser physically
disconnected, until approximately 1:40pm, at which time we reconnected
and switched back to the Maser, and resynchronized to the GPS. An
X-band observation ran throughout, and remained happy through all
switching transitions.
This test gives us confidence that, in the event of a Maser failure, we
can continue operations with minimal disruption. Although this test
demonstrated short-term repeatability, another test will be planned over
the next few months, to ensure that this behavior is repeatable on
longer time periods.
--