[evlatests] [evla-sw-discuss] EVLA power outage
Chuck Kutz
ckutz at nrao.edu
Mon Jul 26 09:42:14 EDT 2010
If the site was down for to long, the UPS probably discharged far enough
to loose the signal generator. We will get it all restarted this morning.
Chuck
Ken Sowinski wrote:
> On Sat, 24 Jul 2010, Matt Gardiner wrote:
>> API - RMS Phase is not available although the emr1-m353_api is talking.
>
> The problem here is that there is no IF power from either of the dishes.
> I suspect that the jury-rigged synthesizer lost power and did not come
> back properly.
>