[evlatests] ea05 passed Electronics Acceptance test
Steven Durand
sdurand at nrao.edu
Fri Apr 18 16:15:29 EDT 2008
ea05 passed Electronics Acceptance test as of 14:00 April 18, 2008.
The L305 is having sync problems but I have been told this will not
affect data.
The passband in Lband has strong RFI, see attached JPG.
The test report is localed in
EVLA/techdocs/sysintegrt/antenna_Acceptance_Tests
There is no L352 module so Round trip Phase does not work
Pband does not work either, Maybe next month
--
Steven J. Durand National Radio Astronomy Observatory
Electronics Division 1003 Lopezville Road
505/835-7103 Socorro, New Mexico 87801
-------------- next part --------------
A non-text attachment was scrubbed...
Name: EA05 LBand.jpg
Type: image/jpeg
Size: 24194 bytes
Desc: not available
URL: <http://listmgr.nrao.edu/pipermail/evlatests/attachments/20080418/49cf9e03/attachment.jpg>
More information about the evlatests
mailing list