[evlatests] evla timing
Pete Whiteis
pwhiteis at aoc.nrao.edu
Mon Feb 27 11:44:12 EST 2006
All 6 L302's have now been modified to fix the timing truncation
error. I'll stay tuned for feedback from today's observation.
-Pete-
Ken Sowinski wrote:
>The Walsh sequence generating code in the mib should be able to
>tolerate time errors which approach half a WG cycle, but there was
>an error which causes it be in one state or the other according to
>whether time in the mib was ahead or behind the "true" time
>associated with a WG cycle tick. The code has been corrected, and
>once installed the L302s should be much more stable with respect to
>small time errors in the mib.
>
>
>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: pwhiteis.vcf
Type: text/x-vcard
Size: 144 bytes
Desc: not available
URL: <http://listmgr.nrao.edu/pipermail/evlatests/attachments/20060227/4694a44e/attachment.vcf>
More information about the evlatests
mailing list