[evla-sw-discuss] jira re-org
Bryan Butler
bbutler at nrao.edu
Tue May 15 17:58:26 EDT 2007
i'd like to further split the organization, to reflect what we have in the org
chart (which in some ways resembles reality, though not all...).
we should have 4 "projects" at the highest level:
- EVLA M&C
- EVLA SSS
- NRAO-wide SSS (whatever we call it)
- WIDAR
WIDAR shouldn't be a sub-project of M&C, but rather its own beast, with lots of
subprojects (CBE, MIB, GUIs, whatever else)...
-bryan
On 5/15/07 15:36, Stephan Witz wrote:
> JIRA users,
>
> last week I split up the existing JIRA project EVLA into two
> separate projects, EVLA M&C and EVLA SSS. I've moved the WIDAR
> and MONARCHIVE components into EVLA M&C. This has been rumor
> control.
>