[daip] DBCON on many files
Walter Brisken
wbrisken at lbo.us
Fri Mar 30 17:10:41 EDT 2018
Hi DAIP,
In a VLBA project we are amassing integration time for a filler project
over many separate observations. The final step in data processing before
imaging is to concatenate all of the epochs with DBCON. This is proving
to take an increasingly long time with each epoch. What I am doing is
running it N-1 times for N projects and setting INNAME/INCLASS to the
DBCON output from previous merges and IN2NAME/IN2CLASS to the next
unmerged file. Some questions:
1. Is there any task other than DBCON that could be used for this?
Antenna tables are subtly different each epoch so each has to be in
separate subarray.
2. Would it be better to run DBCON with INNAME/INCLASS and
IN2NAME/IN2CLASS swapped?
3. Would a heirachical merge be more efficient than a sequential merge?
Thanks,
Walter
--
-------------------------
Walter Brisken
Director
Long Baseline Observatory
(575)-835-7133 (office)
(505)-234-5912 (cell)
More information about the Daip
mailing list