<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
  <meta content="text/html;charset=ISO-8859-1" http-equiv="Content-Type">
</head>
<body bgcolor="#ffffff" text="#000000">
Walter,<br>
<br>
<blockquote cite="midPine.LNX.4.64.0608251316180.5040@parallax"
 type="cite">
  <pre wrap=""><!---->
The four comes from the 4 timers (though you say 8 which could be the 
case -- the Project book is ambiguous if you ask me!).  In any case each 
BB can be locked to only 1 pulsar at a time, so you are BB limited.
  </pre>
</blockquote>
<br>
It should be noted that the timers for pulsar gating and the timing for
pulsar phase binning are two separate beasts in the correlator.  Why
you would want to run both simultaneously, possibly with different
ephemerises (ephemeri?), is beyond me, though.<br>
<br>
<pre class="moz-signature" cols="72">-- 
Brent R. Carlson
<a class="moz-txt-link-abbreviated" href="mailto:Brent.Carlson@nrc-cnrc.gc.ca">Brent.Carlson@nrc-cnrc.gc.ca</a>
Tel/Tél: (250) 493-2277 (ext. 346) |  Fax: (250) 493-7767
Design Engineer                    |  Ingenieur Concepteur
National Research Council Canada   |  Conseil national de recherches Canada
Dominion Radio Astrophysical Obs.  |  Observatoire federal de radioastrophysique
P.O. Box 248, 717 White Lake Rd    |  C.P. 248, 717 Rue White Lake
Penticton, BC, Canada V2A 6K3      |  Penticton, (C.-B.), Canada V2A 6K3
Government of Canada               |  Gouvernement du Canada</pre>
</body>
</html>