<html>
<head>
<meta http-equiv="content-type" content="text/html; charset=UTF-8">
</head>
<body>
<p>Hi,</p>
<p>I'm calibrating 43GHz spectral line VLBA data with AIPS DEC20
(and tried also DEC19) of</p>
<p>our recent project BS285A. When I run CVEL, everything seems
normal but <br>
</p>
<p>when applying the BP table, I plot the data and something goes
wrong with <br>
</p>
<p>the bandpass. I'm sending you an example in the two files, you
can see that</p>
<p>the original UVDATA (bs285A-SINCVEL.eps) looks fine applying the
bandpass.</p>
<p>Once I run CVEL, the bandpasses are not well applied
(bs285A-cvel+bp.eps).</p>
<p>The same problem appears if in CVEL I don't apply the BP table,
and then with <br>
</p>
<p>POSSM I plot it, so I think it is something related to the CVEL
task. <br>
</p>
<p>I've also checked the SU table (maybe for something wrong that I
may've done</p>
<p>within SETJY), but I think the frequencies are set ok (yellow in
bs285A-SU-table.pdf).</p>
<p>I'll be very grateful if you could help me solve this mistery!</p>
<p>thanks,</p>
<p>greetings,</p>
<p>Rebeca<br>
</p>
<p><br>
</p>
<p><a href="mailto:aipsmail@nrao.edu"><em><strong><br>
</strong></em><strong></strong><strong></strong></a></p>
</body>
</html>