ALMA WEEKLY PROGRESS REPORT
Week Ending 2nd January 2004
Name: Jeff Mangum
IPT: AEG
ATF:
(1) Dealt with some minor problems associated with a power failure
which occured over the weekend.
(2) Worked on draft of ATF holography results document.
Science/Computing:
(1) Reviewed latest "System Design Description" document.
(2) Reviewed latest "Time Synchronization Design Rules" document.
Name: Clint Janes
IPT: Back End
Submitted JAO Quarterly and bi-weekly reports.
Revised Site TB/BE ICD and sent to Simon and others for review. Prepared
more input to PMCS. First try at V/F digitizer had too many problems and
so
scrapped. Now
trying to nail down requirements better before embarking on new effort.
Requested ICD for Ethernet switch, if it is indeed in BE digital rack.
Currently, conflicting information.
Prototype System Integrator wants long list of equipment for Tucson not
in baseline or any other BE planning. Currently, deciding how best to
respond.
Janet Bauer
ALMA Project Secretary
NRAO - ALMA North American Project Office
2496 Old Ivy Road, Suite 226
Charlottesville, VA 22903
434.296.0296 (phone)
434.296.0255 (fax)
<mailto:jbauer at nrao.edu> jbauer at nrao.edu (E-mail)
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://listmgr.nrao.edu/pipermail/alma_na/attachments/20040106/208d2a22/attachment.html>
More information about the Alma_na
mailing list